![Airspace change proposals](https://londonsouthendairport.com/wp-content/uploads/2023/01/airspace-changes-960x540.png)
Information on the RNAV / GNSS Approaches ACP
LSA began the process to implement Standard Instrument Departure Procedures (SID’s) alongside the introduction of Controlled Airspace.
The ACP was submitted to the CAA in 2016 for their review and approval.
LSA has decided to withdraw the SIDs ACP and instead progress the introduction of SIDs under the FASI-S ACP.
Information on the RNAV / GNSS Approaches ACP
More information and updates on Airspace Change Proposals at London Southend Airport
Find copies of our current and proposed byelaws